Maintenance & Repairs
Fixed price or hourly rate: which is better?
By Peter Lawrence · 16 November 2026

The short answer: a fixed price is better when the job is clear, because you know the full cost before anyone starts. An hourly rate can be cheaper for a very quick job, and fairer when nobody can know how long it will take.
Fixed price: the good and the bad
- You know the total, including VAT, before you agree.
- A slow tradesperson costs you nothing extra.
- The downside: the price includes a little for the risk of the job taking longer.
Hourly rate: the good and the bad
- For a 20-minute job, it can cost less.
- It suits jobs where nobody knows what they will find, like tracing a leak.
- The downside: the bill can creep up, and you are paying for travel, breaks and trips to the shop.
How Propfix does it
Most of our jobs have a fixed price you can see before you book, such as £89 to hang pictures or shelves, £109 to fix a dripping tap or £139 for a boiler service. For jobs where we can't know the size until we look, like fault finding, we give you a starting price and agree any extra with you before we do it.
Questions to ask any tradesperson
Is the price fixed? Does it include VAT? What happens if it takes longer? Get the answer in writing. See also handyman or maintenance company?
Covering Harrow, Northwood, Ruislip, Uxbridge and Watford. Book at prop-fix.co.uk or call 01895 444 999.
Want it sorted?
Book online at a fixed price including VAT, or call us on 01895 444 999.


